- 
              
Shenzhen to Tai Po twin Submarine Gas Pipeline
A total of 500,000ton rock was delivered and filled along 32km long submarine gas pipeline from Chengtoujiao of Shenzhen to Tai Po of Hong Kong within 4 months period.
 
Shenzhen to Tai Po twin Submarine Gas Pipeline
A total of 500,000ton rock was delivered and filled along 32km long submarine gas pipeline from Chengtoujiao of Shenzhen to Tai Po of Hong Kong within 4 months period.


                                            
  | ||
                                            
  |